Project

TEG Additional Area

Location

Rr. Elbasanit, Tirana

Total Surface

1,800 m²

Realisation time

5 Months

Project Study - Customized Technical Solution

For the TEG Additional Area project, Aluflor installed honeycomb panels produced by Hunter Douglas, chosen for their strength, light weight, and suitability for a large shopping center façade. The system featured large dimensions and a Dutch installation system, which allowed for very fast assembly on site.

A unique aspect of this project is that it was executed in two phases, nearly 10 years apart. Thanks to the exceptional paint quality of the honeycomb material, the panels installed in the first phase remain visually identical to those installed years later. Even at the joint between the old and new sections, it is almost impossible to detect the difference, demonstrating the durability and reliability of the material.

Key features of the project include:

  • High-quality honeycomb panels with excellent surface finish.
  • Large dimensions for a modern and bold façade design.
  •  Fast installation system, minimizing construction time.
  •  Long-term durability, with perfect color consistency even after a decade

Works Performed:

•Supply and Installation – Ventilated Facade with Honeycomb
The building features a ventilated facade using Honeycomb panels, with the following specifications:

•Honeycomb Panel: Q-Premium 30 mm

•Manufacturer: AFS International, Netherlands

•Materials Used:

•Honeycomb Panel, A2 fire-resistant

•Facade Structure: Based on the Q-Premium system

Aluminum Flashing
Aluminum flashing was incorporated to ensure proper sealing and protection of the facade.