Project

Air Albania Stadium

Location

Sheshi Italia, Tiranë

Total Surface

14.000 m2

Realisation time

12 months.

Project Study - Customized Technical Solution

One of the most critical challenges of this project was the combination of an extremely short execution timeline, strict cost limitations, and highly specific architectural requirements. The architect demanded a joint no wider than 5 cm, while at the same time requiring several metal plates to pass through the joint to support the external façade columns.

This condition created significant complexity. In standard solutions, the only way to achieve such functionality would have been by cutting the nose of the horizontal profile. However, this approach would compromise both thermal performance and waterproofing, creating long-term risks for the building envelope.

To overcome this, Aluflor developed a customized solution, designing and producing an entirely new extension of the horizontal profile. Instead of cutting the nose of the profile, the adjustment was made beneath the nose, precisely where the thermal barrier is located. This innovative modification allowed us to:

  • Preserve the architect’s design requirement of a maximum 5 cm joint.
  • Ensure that the thermal insulation performance was not compromised.  Maintain complete waterproofing of the façade system.
  • Enable the safe integration of the metal structures passing through the façade to support the external columns.

 

This tailor-made engineering solution is a clear demonstration of Aluflor’s capability to transform architectural challenges into innovative realities—delivering results without compromising design integrity, functionality, or building performance.

Scope of Work for Air Albania Stadium – Facade and Railing Installation

Works Performed

The scope of work for the Air Albania Stadium centers around the design, supply, and installation of the building’s exterior facade and railing systems, ensuring both visual impact and functional performance. The total surface area of the facade is approximately 10,000 square meters. The key components of the scope of work include:

1.Facade Installation with AGC Glass and Aluminum System
The primary feature of the stadium’s exterior is the striking glass facade, which is constructed using Interpane Glass in combination with a sleek aluminum system. Aluflor’s expertise was integral in the installation of this advanced facade system, ensuring that the building’s exterior offers both aesthetic appeal and superior thermal and acoustic insulation. Curved Shape Glass Railing Installation
In addition to the facade, curved shape glass railings were installed throughout the stadium to ensure safety and enhance the modern look of the venue. The combination of Aluflor’s craftsmanship in installing the glass facade and curved glass railings contributes to the stadium’s iconic design, creating a visually appealing, secure, and energy-efficient structure.