Best Western Hotel
Air Albania Stadium

Scope of Work for Air Albania Stadium – Facade and Railing Installation Works Performed The scope of work for the Air Albania Stadium centers around the design, supply, and installation of the building’s exterior facade and railing systems, ensuring both visual impact and functional performance. The total surface area of the facade is approximately 10,000 […]
CFO Pharma

Completed Works: Supply and Installation – Structural Glass FaçadeSystems used:Wicona Wictec SG90Glass: AGC – Glass configuration: 8 mm | 16 mm | 8 mmOutside pane:Ipasol Grey on Ipasafe laminated glass 44.2 ClearliteCavity: 16 mmGas: Argon; Filling degree: 90%Inside pane: Planibel Clearlite 8 mm Supply and Installation – Ventilated Façade with German AlucobondMaterials used:Alucobond 4 mm […]
Crowne Plaza

Works Performed:
Park Gate

Works Performed: Supply and Installation – Thermal Aluminum Windows and Double Glazed Acoustic Glass The building features thermal aluminum windows and acoustic double glazing, with the following systems: – Opening Windows: Exalco Albio 109C -Sliding Windows: Exalco Albio 225 Glass Specifications: – Outer Glass: Clima Guard Solar 6 mm -Cavity: 16 mm, filled with 90% […]
5th Avenue (New York)
Pascucci al Mare

Works Performed: •Panoramic sliding system •Curtain Wall Façade •Emergency Doors •Automatic Doors •Ventilated and Decorative Façade with Alucobond •Glass railing with integrated LED •Parallel opening windows
Mercedes Benz

Works Performed:
Kastrati Fuel Station
Deutsch Color

Works Performed: •Supply and Installation – Thermal Glass Facade and Double GlazingThe glass facade was installed using the Alumil M6 system, featuring the following specifications: •Glass: Planistar Sun 8 mm •Cavity: 16 mm, filled with 90% Argon •Inner Glass: 44.1 •Noise Reduction: 40dB •Supply and Installation – SkylightSkylights were installed to allow natural light into […]